Mine Portal Stabilization Spray

The mine portal at Costerfield mine required a shotcrete stabilisation spray with fibre reinforced shotcrete. In addition to this TP Structures was required to spray 10m into the opening of the portal subsequent to a tunnel boring machine.

Continue Reading